Customer Responsibilities:
Supply level graveled site for barn 6' larger on all sides
Gravel pad size will be stated on contract
Site must be professionally leveled and compacted for a secure foundation
Preferably built up 6-10" for proper drainage
Backfilling around the outside of the barn after completion, installing whatever material you prefer inside the barn to fill up to the level of the base frames, approximately 6" (gravel, sand, clay, wood, cement, stall mats, or combination of).